High-Rise Buildings in Colorado

High-Rise Buildings guidance for Colorado building owners, technicians, and integrators. State-specific ERRCS requirements, AHJ expectations, and next steps.

Serving Denver, Colorado Springs, Aurora
(888) 508-3001 ext. 1100

High-Rise Buildings support in Colorado

High-rise buildings present unique ERRCS challenges due to vertical coverage requirements, elevator shafts, stairwells, and the natural attenuation of radio signals through multiple floors. Fire codes specifically target high-rises because firefighters may need to communicate between the lobby, fire command center, and upper floors during emergencies. Most jurisdictions define high-rises as buildings over 75 feet, though some use lower thresholds.

BDA Systems supports owners, contractors, and technical teams throughout Colorado. We align project scope with local AHJ expectations, adopted code language, and the practical realities of getting from failed testing to final approval.

Typical Requirements

  • Coverage on all floors including roof
  • 99% coverage in stairwells and elevator lobbies
  • Fire command center radio capability
  • Backup power for minimum 12-24 hours
  • Annual recertification testing

Move the project forward

Speak with the team handling Colorado projects, code interpretation, and field coordination.

Colorado code snapshot

  • Adopted code: IFC 2021
  • AHJ: State Fire Marshal

High-Rise Buildings in Colorado

Get a project-specific plan for Colorado with fast routing to the right technical or compliance team.